用户登录

EVO

Free 7 full days of site power quality logging

Free 7 Full Days of Site Power Quality Logging Using EVO Protocols.

 

When you and our VP Channel Partner have agreed to consider the benefits of power and cost savings, our VP Channel Partner will undertake a full 7 days power quality logging of your site. Unlike any other supplier of Power Optimisation, our Channel Partner will use industrial certified power quality measuring and monitoring equipment connected to the site incoming main power riser. Your site is important and unique. Using the correct power quality measuring tool for the job is not only important but critical to ensuring safe power continuity

Other suppliers of Power Optimisation use cheap socket plug-ins developed for domestic use. These inferior ‘plug-ins’ are unreliable and provide inaccurate results with only basic readings. These ‘inaccurate results’ cannot be relied upon to size correctly the exact power needs of your site nor can they identify existing potential site problems that could damage and/or cause the loss of your investment in Power Optimisation. Usually the users of these ‘plug-ins’ are only identifying the value of your voltage; which is only one element of the 5 critical measurements that need to be taken in order to size the safe and correct Power Optimisation System.

Our Channel Partners use sophisticated and certified power quality instruments to take 3 measurements of the minimum, average and maximum every 1 to 15 seconds of the sites:

1. Volts,
2. Amps,
3. Kilowatts,
4. Power Factor,
5. Harmonic Distortion.

That’s a total of 15 measurements of site
power quality every 1 second; 151,200 measurements
over the seven days of logging.
When the Logging date has been agreed our

Channel Partner engineering staff member (Staff) will visit the site to connect the Power Quality Logging Meter (PQLM). There will be no interruption of power to your site.

After connection of the PQLM the engineering staff will take a reading of the electric meters. You may be asked to confirm the notation of these readings. At the time of this visit the Staff will also:

1. Inspect the sites main Master Breaker Switch and notation of its Amp size.
2. Potential siting of a PropSava.
3. Access for delivery and installation of a PropSava.
4. Position of Distribution Board.

The 7 days of logging data, 12 months electric bills and your view of future power needs will be analysed to determine the correct power sizing of the PropSava.

All Logging is conducted subject to the Efficiency Valuation Organisation (EVO - http://www.evo-world.org) protocols.

VP UNIQUE 3rd GENERATION PRODUCT & SERVICE OFFERING:

World’s 1st POS with Output Voltage set by the User - 210V to 230V.
3rd Generation Systems include ‘Cutting Edge’ safety systems at No Extra Charge.
3rd Generation Products Independently Tested and Certified to CE & IEC safety standards.
3rd Generation Systems are custom Built to Meet Your Unique Site Requirements.
3rd Generation Systems Sold, Installed & Maintained world-wide by VP Trained, Certified and Insured Channel Partners.
Commissioned Systems have 10 to 20 years Warranty.
See all Your Existing and Historic Power Usage Over a LAN or Internet with our Power Quality Metering System.
Free and Without Obligation Quotation Service. 
Free 7 Full Days of Site Power Quality Logging Using EVO Protocols. 

 

 

 

 

 

 

 

 

 

Shenzhen,China